(a) No work shall be done on any part of the building or structure beyond the point indicated in each successive inspection without first obtaining the written approval of the Director of Building and Zoning. Such written approval shall be given only after an inspection shall have been made of each successive step in the construction as indicated by each of the inspections required in Section 1325.09.
(b) There shall be a final inspection and approval on all buildings and mechanical equipment governed by this Code, when completed and ready for occupancy and use.
(Ord. 41-79. Passed 11-5-79; Ord. 92-33. Passed 12-7-92.)