§ 94.44 EQUIPMENT; PERMIT AND INSTALLATION.
   (A)   No equipment for the utilization of liquefied petroleum gas shall be installed in the village unless a permit therefore has first been secured. When such installation is in a building being newly constructed or remodeled in accordance with a permit for such construction or remodeling, no extra fee for such permit shall be required. In other cases, applications for such permits shall be made to the Village Clerk and shall contain a description of the location, equipment and intended use of such equipment. The fee for such permits shall be as assessed by the Board of Trustees.
   (B)   No such equipment shall be installed or used unless it complies with the standards therefore established by the N.B.F.U.
(Ord. 2004-09, passed 9-21-2004) Penalty, see § 94.99
Cross-reference:
   Fee schedule, see § 33.32