12-6-11: IMPROVED SITES:
All sites shall be dedicated in a condition ready for full service of electrical, water, sewer and streets (including enclosed drainage, streetlights, and curb and gutter) as applicable to the location of the site, or acceptable provision made therefor. The sidewalks normally included within the definition of "improved sites" may be delayed due to the delay time between dedication of any such school sites and construction of school facilities thereon. (Ord. 96-32, 4-18-1996)