§ 50.44 EXCAVATIONS.
   All excavations required for the installation of a building sanitary sewer shall be open trench work unless otherwise approved by the Superintendent. Pipe laying and backfill shall be performed in accordance with ASTM specification (C12-19), except that no backfill shall be placed until the work has been inspected.