All improved areas within dedicated street rights-of-way shall be graded, topsoiled and seeded in accordance with the construction schedule. Street trees shall be required and planted in accordance with the approved street tree plan.
The number, type and location of trees planted shall be based upon the existing trees preserved on the site and the extent of entrance plantings or other special landscaping proposed and shall be shown on a landscaping plan to be submitted with the final plat.
Size, spacing, species and planting techniques of street trees shall be in accordance with the City of Geneva Subdivision Standards.
The subdivider shall be responsible for the establishment of required trees and such responsibility shall extend for one year from the date of original planting. The Development Engineer may require that a bond be posted to ensure the planting and replacement of trees. The amount of said bond shall be based on the estimated costs of plantings and establishing the required trees.
(Ord. 2381. Passed 11-22-93.)