1042.115  SEWER MAIN LOCATION.
   Sanitary sewer mains shall be installed within the street and proximal to be centerline of the road.  Bedding for said sewer shall be Class I, II, or III, as described in ASTMD 2321 and required by the Wastewater Superintendent.  It shall be carefully compacted to provide the proper support for the anticipated load, based on the type of soil encountered and potential groundwater conditions.
(Ord. 2717.  Passed 5-14-01.)