8-1-3: CHANGES IN CONNECTION:
   A.   Existing: In the case of existing water meter or existing connections to the mains, if such change is for the convenience of the property owner or person requesting such change, then such person shall excavate the ditch and refill the same after the change is made. The owner or person requesting the change shall also pay for all materials actually expended in making such change. Where a larger meter than the existing meter is connected at the request of the property owner or person requesting the change, then such person shall pay an additional charge for such meter in an amount equal to the difference between the charge for the larger and smaller meter as set out in the schedule of charges for meters as provided in subsection 8-1-2H of this chapter, plus the cost of the other material expended in making the change. If such change is made at the request or for the convenience of the city, then the city shall bear the entire cost of making the change.
   B.   Changeover: In the event of a "changeover" connection, where a connection is changed from an old or existing water main to a new or other water main, then the city shall bear the whole cost thereof. (Ord. C61-25, 4-21-1964)