7-2-4: INSPECTION AND REMOVAL:
   A.   Notice For Inspection: The city engineer shall be given one day's notice before any concrete is poured so that inspection can be made of the subgrade, the forms and spacing for joints. (Ord. C66-149, 7-12-1977; amd. 2006 Code)
   B.   Enforcement; Removal: The city engineer is hereby charged with the duty of making inspection to determine if the sidewalk being constructed is in accordance with the terms and specifications of the city's land development standards, and any sidewalk constructed in violation of the city's land development standards shall be ordered removed by the city engineer, and upon the failure of the property owner to remove the same, the city may remove the same, charging the cost of such removal to the property owner, which cost shall be in addition to the penalties provided for violations of this code. (1961 Code § 9-3-4; amd. 2006 Code)