1337.06 REQUIREMENTS.
   By obtaining a permit the property owner agrees to the following requirements as they relate to the demolition of the building(s) or structure(s) and the final site conditions at the completion of the project:
   (a)   All demolition and site work is to be completed within thirty (30) days of obtaining the permit. At the request of the property owner or his authorized agent, and at the discretion of the Code Official, an additional thirty (30) days may be granted for the completion of larger commercial or industrial projects.
   (b)   All portions of the building(s) or structure(s) and associated systems above and below grade shall be removed, including but not limited to roof, walls, floors, slabs, footers, equipment, piping and cables.
   (c)   All debris shall be removed from the site and disposed of in accordance with applicable federal, state and local laws.
   (d)   All utility connections shall be disconnected at their point of supply to the property and shall be capped, plugged or terminated in accordance with all local utility procedures and requirements.
   (e)   All excavations shall be backfilled with clean fill and compacted.
   (f)   The site shall be graded for proper drainage and seeded to prevent soil erosion.
      (Ord. 2010-18. Passed 6-22-10.)