Upon determining to proceed with a preliminary plan, the Owner/ Developer shall submit nine (9) complete sets of drawings and other material for an application as specified in Section 1111.04 below, to the Code Inspector, along with applicable fees as established by City Council in separate Ordinance.
Within fifteen (15) working days from receipt, the Code Inspector shall review the submitted materials to determine completeness. If the application meets the submittal requirements as specified in Section 1111.04 below, the Code Inspector shall certify such application and proceed with review. If the application is found to be incomplete, the Owner/Developer shall be notified, and the submitted materials shall be so marked.
(Ord. 2009-85. Passed 12-8-09.)