925.36 PERMIT CONDITIONS, DURATION AND LIMITATIONS.
   (a)   Industrial Waste Discharge Permits shall specify no less than the following:
      (1)   Fees and charges to be paid upon initial permit issuance;
      (2)   Limits on the average and maximum wastewater constituents and characteristics regulated thereby;
      (3)   Limits on average and maximum rate and time of discharge and/or requirements for flow regulations and equalization;
      (4)   Requirements for installation and maintenance of inspection and sampling facilities;
      (5)   Special conditions as the City may require under special circumstances of a given discharge including sampling locations, frequency of sampling, number, types, and standards for tests and reporting schedule;
      (6)   Compliance schedules;
      (7)   Requirements for submission of special technical reports or discharge reports if different from those prescribed by this chapter.
   (b)   All Industrial Waste Discharge Permits shall be issued for a six year period, subject to amendment or revocation as provided in this chapter. Under special circumstances, a permit may be issued for a limited period of time. Industrial Waste Discharge Permits shall be issued to a specific User for a specific operation and are not assignable to another User without the prior written approval of the City, or transferable to any other location.
(Ord. 90-5835. Passed 8-14-90.)