Skip to code content (skip section selection)
Compare to:
§ 12.5-868 HEIGHT AND SLOPE RESTRICTIONS.
   The placement or import of the fill material must meet the following conditions:
   (a)   The purpose of the fill material is to make the land suitable for the construction of surface improvements;
   (b)   The fill material shall not be higher than the highest elevation along the perimeter of the adjacent tracts, parcels or platted lots, however; fill material placed on pad sites shall not exceed three feet in height above the highest elevation along the perimeter of the adjacent tracts, parcels or platted lots;
   (c)   The slope of the fill material is a maximum ratio of three feet horizontal to one foot vertical, unless a retaining wall system built in compliance with the city code and regulations is in place; and
   (d)   Fill material must be leveled and graded for positive drainage no less than every 30 days.
(Ord. 15789, § 1, passed 12-9-2003)