§ 151.111 MAINTAINING DRAWINGS OF UNDERGROUND STRUCTURES.
   Users of subsurface street space shall maintain accurate drawings, plans and profiles showing the location and character of all underground structures, including abandoned installations. Corrected maps shall be filed with the Director of Public Works or his or her designee within 30 days after new installations, changes or replacements are made.
(Prior Code, § K-5-30) Penalty, see § 151.999
Statutory reference:
   Related provisions, see SDCL §§ 9-30-1 and 9-45-1