§ 70.53 CRITERIA FOR CONSIDERATION OF SPEED HUMPS.
   (A)   In order for a city street eligible under § 70.52 to have a speed hump constructed thereon, the following criteria must first be met:
      (1)   Delivery to the City Administrative Officer of a petition signed by not less than a total of ten SFR, and/or MFR, or a combination thereof, from the affected street segment where the proposed speed hump is to be installed; a residence is affected if it is located upon the street segment. The petition shall contain the following information:
         (a)   A caption that includes, in bold font, at least 14 point, “A PETITION TO INSTALL SPEED HUMP(S) ON [Name of street or road] STREET/ROAD”;
         (b)   The legibly printed name, address, and signature of each petitioner; and
         (c)   A description of the affected street segment, either by listing the addresses or address range of the residents along the segment, or a description of the starting point and stopping point of the affected street segment.
      (2)   The criteria and requirements set forth in this section and § 70.52 for a speed hump to be located, constructed and installed are met.
      (3)   The eligible street has not failed to meet the requirements set forth in § 70.52 within one year from the date the petition referenced in § 70.53(A)(1) is delivered to City Administrative Officer.
   (B)   If the above criteria have been satisfied, the city shall prepare and deliver a notice and ballot relative to the street hump to those persons entitled to vote as provided in § 70.54.
(Ord. 2013-17, passed 8-19-13)