§ 6-5-36 CHANGES IN LOAD.
   In cases where production, or other changes in the water supply or system result in a meter being substantially undersized or oversized, the city may require the property owner to buy and have installed a larger or smaller meter. Any alterations in the meter setting will be at the owner’s expense.
(Ord. D-20, passed 10-21-2014)