If an existing water service is to be repaired, the materials used for the repair shall be of the type and size specified for new services. If a major portion of either section of the service, between the water meter pit and the building, should be replaced, then that entire section should be replaced with material as approved for new services and approved by the city.
(Ord. D-20, passed 10-21-2014)