§ 1-19-8.350. SPRING WATER HARVESTING IN THE RC DISTRICT.
   The following provisions shall apply to spring water harvesting uses in the RC District.
   (A)   The minimum lot area, lot width, yard setbacks and height shall be as provided for natural resource uses in the table in § 1-19-6.100.
   (B)   Operations will be conducted within a completely enclosed building, subject to a 150 foot minimum setback from all property lines.
   (C)   An engineer certified hydro-geologic study must be provided to assess the impact of the operation on the groundwater resources of all properties within 2,000 feet of the subject site.
   (D)   The subject property must have frontage and access on a paved public road suitable for the amount and type of vehicle traffic proposed. Spring water harvesting of less than 10,000 gallons per day does not need frontage to a paved road, but if an easement is used, agreement from the grantor or users of the easement must be obtained prior to approval, and operations shall be limited to straight chassis trucks of a gross vehicle weight not exceeding 66,000 pounds and a maximum of 3 loads per day.
   (E)   Within the RC District, the requirements of § 1-19-7.200 of this Code will be met.
   (F)   One freestanding sign is permitted and will be no more than 15 feet in height and 25 square feet in area and subject to the normal setback requirement for natural resource uses.
(Ord. 95-02-126, 3-2-1995; Ord. 97-08-186, 5-22-1997; Ord. 08-26-502, 10-14-2008; Ord. 09-21-525, 6-4-2009; Ord. 14-23-678, 11-13-2014)