§ 52.17 ORDERLY ALLOCATION OF FACILITIES.
   (A)   All persons, firms or corporations who shall obtain volume allocations and/or authorizations or permits to connect to the town’s sewer and/or water mains or lines shall commence the construction or installation of the lines to be connected to the town’s sewer and/or water mains within 12 months from the date of such volume allocations, authorizations or permits; and shall complete such construction or installation and make connection with the town’s sewer and/or water mains within 30 months from that date.
   (B)   All persons, firms or corporations that have heretofore received volume allocations and/or authorizations or permits to connect to the town’s sewer and/or water mains or lines shall commence the construction or installation of the lines to be connected to the town’s sewer and/or water mains within 12 months of the date of the enactment of this section; and shall complete such construction or installation and make connection with the town’s sewer and/or water mains within 30 months from this date.
   (C)   Volume allocations, authorizations and permits to connect to the town’s sewer and/or water mains or lines shall automatically expire and be terminated for failure to comply with divisions (A) and/or (B) above.
(Ord. passed 9-2-97)