§ 51.054  CONSTRUCTION SPECIFICATIONS.
   The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the city.  In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 current issue, and the Uniform Building and Plumbing Code of the state shall apply.
('75 Code, § 7.26)  (Ord. PO-80-1, passed 11-24-80)