§ 51.050  PERMIT REQUIRED; CLASSIFICATIONS.
   (A)   No person shall uncover, make any connections with or opening into, use, alter, or disturb any public sewer, or appurtenance thereof, without first obtaining a written permit from the Utility Service Board or its agents.
   (B)   There shall be three classes of building sewer inspection permits for replacement or repair: (1) residential service, (2) for commercial service, and (3) for service to establishments producing industrial wastes.  In each case, the owner or his representative shall make application on a special form furnished by the Board.  The permit application shall be supplemented by any plans, specifications, or other information considered pertinent in the judgment of the Board or its agents.  There shall be a charge of $25 for a residential service, $50 for a commercial service, and $100 for an industrial service made for the permit and inspection.
   (C)   New services.
      (1)   Residential sewer tap/connection fee shall be $325. If more than one tap is required per lot, additional tap(s) shall be billed based on time and material with a minimum cost of $325 per tap.
      (2)   All other sewer tap/connections shall be $400. If no tap is available, the tap/connection fee will be billed based on time and material with a minimum cost $400 per tap.
      (3)   If more than one tap is required per lot, additional tap(s) shall be billed based on time and material with a minimum cost of $400 per tap.
      (4)   If more than one Family, Office, or Business occupies the same building, then the initial permit/connection fee shall be a minimum of $400 plus an additional $25 per unit thereafter.
('75 Code, § 7.29)  (Ord. 4-78, passed 7-18-55; Am. Ord. PO-80-1, passed 11-24-80; Am. Ord. PO-98-4, passed 6-8-98)  Penalty, see §  51.99