Project Design Letter of Credit | 18-22% of construction costs (determined by City Engineer) |
Public Improvement Costs Letter of Credit | 125% of construction costs |
Private Improvement Costs Letter of Credit | 125% of construction costs |
Sanitary Sewer Trunk Area Charges (SSTAC) | |
Residential | $4,000.00 per acre |
Commercial / Industrial | $4,500.00 per acre |
Stormwater Trunk Area Charge (STAC) | |
Non-Residential | $4,500.00 |
Water System Trunk Area Charges (WTAC) | $5,000.00 per acre |
Sealcoat Fee | $0.30 per square foot of public road |
Parkland Dedication Fee Estimate* | |
Residential Zoned Property | $2,500.00 per residential unit* |
Non-Residential Zoned Property | $2,500.00 base and $2,500.00 per acre* |
Mixed-Use Property | Fees be based on the amount of land designated to each use |
Due at time of building permit issuance | |
Sewer Availability Charge (SAC) | |
Metropolitan Council | $2,485.00 per SAC unit or as set by Metropolitan Council |
City Core | $3,600.00 per unit* |
Stormwater Area Charges (STAC) | |
Residential | $2,000.00 per unit* |
Multi-Family | $500.00 per unit* |
Water Availability Charge (WAC) | $3,600.00 per unit** |
Note: Other fees or costs may be required as part of a Site Improvement or Development Agreement for needs associated with project, such as existing street improvements, traffic signals, materials testing, drainage, and the like. | |
All plans for public improvement projects, including private streets projects with public utilities, may be prepared by a qualified engineer as stipulated by a Zoning Code amendment adopted by the city. Construction is to be funded privately by the project developer. Financial guarantees in the form of a letter of credit for engineering and construction costs is to be posted with the city prior to the start of construction. * City Sewer Core Fee and City STAC Fee units are determined in accordance with Metropolitan Council SAC Fee determination at a 1:1 ratio. **City WAC Fee units are determined in accordance with Metropolitan Council SAC Fee determination at a 1:1 ratio for domestic water. City WAC Fee charges for Commercial/Industrial irrigation is determined based on a meter size in the following chart: Meter Size Equivalent Units 3/4 1 1 2 1 ½ 4 2 16 3 18 4 32 6 72 8 128 | |
(Ord. 625, passed 2-11-2013; Am. Ord. 653, passed 3-14-2016; Am. Ord. 661, passed 11-14- 2016; Am. Ord. 685, passed 12-10-2018; Am. Ord. 686, passed 2-25-2019; Am. Ord. 687, passed 3-14-2019; Am. Ord. 688, passed 3-14-2019; Am. Ord. 692, passed 12-9-2019; Am. Ord. 700, passed - -2020; Am. Ord. 706, passed 12-13-2021; Am. Ord. 708, passed 5-23- 2022; Am. Ord. 714, passed 12-12-2022; Am. Ord. 718, passed 1-9-2023)