A
that is not specifically listed as exempt from the provisions of this
Code may not be erected, constructed, attached, relocated, or structurally altered without obtaining
approval. Approval is not required for
listed as exempt or for routine
.
A. A permit to modify an existing
, or to legalize a
for which a permit was not obtained when it was constructed, will be processed by a Type 1 procedure.
B. A permit for new
s will be processed by means of a Type 1 procedure, using the applicable standards of this
Code as approval criteria.
(Ord. 2009-01, passed 3-9-2009; Ord. 2009-12, passed 11-23-2009; Ord. 2013-3, passed 5-22-2013; Ord. 2019-05, passed 6-24-2019)