A. Underground utilities. All utility lines in new shall be placed underground, and:
1. The developer shall make all necessary arrangements with the serving utility to provide the underground services;
2. The
reserves the right to approve location of all surface mounted facilities;
3. All underground utilities, including sanitary sewers and storm drains installed in
by the developer, shall be constructed prior to the surfacing of the
; and
4. Stubs for service connections shall be long enough to avoid disturbing the
improvements when service connections are made.
B. Information on
plans. The for a shall show on the plan or in the explanatory information, for all underground utility facilities, and:
1. Plans showing the location of all underground facilities as described herein shall be submitted to the
for review and approval; and
2. Care shall be taken in all cases to ensure that above ground equipment does not obstruct vision clearance areas for vehicular traffic.
C.
to under-grounding requirement for infill
. An for infill , which is served by above ground utilities, may be exempt from the requirement for undergrounding utilities. This shall apply only to existing utility lines.
(Ord. 2009-01, passed 3-9-2009; Ord. 2013-3, passed 5-22-2013)