A. Water facilities required. Water facilities shall be installed to serve each new and to connect to existing mains in accordance with the provisions set forth in the adopted policies of the and the ’s Master Water Plan.
B. Water plan approval. The shall approve all plans for water facilities and proposed systems prior to issuance of permits involving water service.
C. Over-sizing. Proposed water facilities shall include consideration of additional within the area as projected by the .
D. Permits denied. permits may be restricted by the Planning Commission or Hearings Officer where a deficiency exists in the existing water system or portion thereof which cannot be rectified within the and which, if not rectified, will result in a threat to public health or safety or violations of local, state or federal standards pertaining to the operation of the water system.
(Ord. 2009-01, passed 3-9-2009; Ord. 2013-3, passed 5-22-2013)