§ 17.8.350 CRITICAL FACILITY.
   Construction of new shall be, to the extent possible, located outside the limits of the Special Hazard Area (SFHA) (100-year ). Construction of new shall be permissible within the SFHA if no feasible alternative is available. constructed within the SFHA shall have the elevated three feet above BFE or to the height of the 500-year , whichever is higher. to and from the should also be protected to the height utilized above. Floodproofing and sealing measures must be taken to ensure that toxic substances will not be displaced by or released into floodwaters. routes elevated to or above the level of the elevation shall be provided to all to the extent possible.
(Ord. 2009-01, passed 3-9-2009; Ord. 2013-3, passed 5-22-2013)