In order to ensure that
and
within NRAs are not damaged during construction, all
, even those not developing within an NRA, shall provide a construction management plan that includes the following information:
A. Location of
and
that construction equipment will use;
B. Equipment and material staging and stockpile areas;
C. Erosion and sediment control measures; and
(Ord. 2009-01, passed 3-9-2009)