§ 52.14 INSPECTION BEFORE TRENCHES ARE FILLED.
   No trench shall be refilled, or any connecting sewer constructed under §§ 52.03 through 52.18 until they have been inspected and approved by the City Engineer, or until they have been made to conform to §§ 52.03 through 52.18.
(Prior Code, § 4.460)