§ 52.09 CLEANOUTS AND MANHOLES.
   Cleanouts shall be placed at the foot of each vertical line of soil pipe, where practical, and in all changes of directions of waste pipes leading to the same. Manholes must be constructed to give access to cleanouts, where practical.
(Prior Code, § 4.435)