§ 166.13 PEDESTRIAN IMPROVEMENTS.
   (A)   Purpose and intent. The intent of these provisions is to promote the construction of multi-use paths within the commercial districts to provide safe routes for pedestrians and bicyclists.
   (B)   Applicability. The requirements of this section shall apply to all properties in the Island Commercial District and Downtown Commercial District for which City Council has approved a conceptual plan for multi-use paths located in the right-of-way adjacent to the property.
   (C)   A separated 12-foot multi-use path shall be installed adjacent to all parcels in an areas with an approved conceptual plan for multi-use paths upon the construction of any new commercial or residential structure as well as upon the substantial improvement of any existing commercial or residential structure.
      (1)   The city shall be responsible for the final design, engineering, and permitting along with associated costs for each section of the path.
      (2)   The construction costs shall be paid by the property owner. Upon request, the city may assist with bidding for construction.
      (3)   The approved conceptual design may be altered by the city if conflicts with trees, utilities, or other conditions exist that would render the required width unfeasible.
(Ord. 015-22, passed 6-14-22)