§ 150.032 CERTIFICATE OF APPROVAL; NOTICE TO UTILITY.
   (A)   After each required inspection, a notice shall be given to the permit holder as to approval or disapproval, with a listing of required corrections if there be any required. Electrical wiring shall not be covered or concealed until after the work has been approved. Inspection shall be made by the Electrical Inspector within 48 hours of the request for inspection by the contractor. If the notice indicates that corrections are needed, the corrections shall be made forthwith and the Electrical Inspector notified and a reinspection requested.
   (B)   Upon final inspection of the electrical wiring and in compliance with this code, a certificate of approval, if required, shall be issued to the permit holder notifying them of the approval. It shall be unlawful for any person to connect or reconnect any installation of electrical wiring, devices, appliances or equipment to a source of supply until a certificate of approval authorizing the connection has been issued by the Electrical Inspector or unless a temporary release has been issued.
   (C)   When, in a building, the construction necessitates that connection of the permanent service or source of supply be made prior to the final inspection, a temporary release may be requested by the permit holder and be issued by the Electrical Inspector, with notification given of a temporary release to the utility. The release is of a temporary nature and shall be superseded by a final inspection and a certificate of approval.
(`95 Code, § 5-3-38)