§ 150.010 STORM HAZARD REDUCTION ON CONSTRUCTION SITES.
   In the event that the Municipal Emergency Operations Center has been activated and declared at least an Emergency Operation Condition Level 3:
   (A)   No delivery of construction material shall be allowed to active construction sites on the island.
   (B)   Permit holders or owners of active construction sites within the city shall remove, store, or secure under or inside the structure, all loose materials and potential windborne debris from any building site. Loose materials inside and under the structure shall be tied down mechanically to the grade below the structure or framing of the structure with strapping, structural frames, or other methods approved by the building official, or any employee of the Department of Public Safety designated by the building official.
   (C)   Construction dumpsters shall be dumped or removed from any building site. Questions regarding or requests for verification of satisfactory site conditions shall be directed through to the Incident Command Center.
(Ord. 03-18, passed 4-24-18)