§ 50.134 TAPS FOR WATER MAIN EXTENSIONS.
   Charges included in the Town of Florence Fee Schedule are for the actual tapping operation only and do not include materials. The contractor must furnish and install the saddle and tapping sleeve and valve and make the excavation sufficient size to allow town field crews enough room to perform necessary work. Please see Town of Florence Schedule of Fees (Fee Schedule may be viewed online at www.town.florence.az.us).
(Prior Code, Ch. 18, Art. II, § 18-95) (Ord. 385-05, passed 6-20-2005)