§ 50.076 DEVELOPERS TO INSTALL SERVICE CONNECTIONS ON NEW MAINS IN NEW SUBDIVISIONS.
   In all new subdivisions or other developments where there are no existing town water mains, developers are required to have their contractors install all three-fourths-inch and/or one-inch service connections simultaneously with the installation of the subdivision's water mains. Services one and one-half inches and/or two inches in size may also be installed by the developer's contractor if so approved by the Public Works Director. Services larger than two inches shall be installed by town forces. The concrete vaults required for services three inches and larger in size shall be constructed by the developer or his or her contractor in accordance with applicable Town of Florence standards specifications and details. In all new subdivisions or other developments where the developer's contractors install the service connections, application must be made to the town Water and Wastewater Division as otherwise provided in this code, for installation of water meters.
(Prior Code, Ch. 18, Art. II, § 18-64) (Ord. 346-04, passed 6-21-2004)