§ 50.051 ENGINEERING COSTS; INSPECTION OF CONSTRUCTION.
   (A)   The costs for the preparation of construction plans for the proposed water mains as well as the costs of staking the location of the water mains, the cost of inspecting the construction, the costs of acquiring rights-of-way and easements and preparation of as-built plans, shall be part of the construction cost assumed by the developer in accordance with plans approved by the Public Works Director. Review fees shall be paid as set forth in the Town Code.
   (B)   The Public Works Department will not perform field engineering or submit detailed plans and specifications for the developer. This latter work is to be performed by a civil engineer registered in the state employed by the developer. The final detailed plan and specification for the “approach main” extension must be approved by the Public Works Department before construction begins. The engineering cost for preparation of plans and staking of the “approach main” only, incurred by the developer may be included in the agreed construction cost as provided in § 50.050. The engineering costs will be agreed upon by the town and developer for determination of total construction cost prior to completion of the repayment agreement.
(Prior Code, Ch. 18, Art. II, § 18-55) (Ord. 346-04, passed 6-21-2004)