§ 50.013 GENERAL CONSTRUCTION WATER; FROM FIRE HYDRANTS; UN-METERED WATER TO BE ESTIMATED.
   When water for construction is required by a contractor, it shall be supplied through a meter whenever possible. Where an existing service connection is not available, or is of insufficient size, the contractor may apply to the Water and Wastewater Division for a fire hydrant meter. The application may be approved subject to the applicant's compliance with all rules and regulations established by the Public Works Department pertaining to the use of construction water from fire hydrant and the payments of applicable fees and charges.
(Prior Code, Ch. 18, Art. II, § 18-37) (Ord. 346-04, passed 6-21-2004)