The owner of any lot, parcel, real estate or building connection to the sewage works as required in § 54.05(B) of this chapter shall, prior to being permitted to make a connection, pay a connection charge in the amount of $750, plus the costs of any material required for each connection. The Town Council finds such a connection charge to be a reasonable and an equitable pro rata cost of maintenance for the facilities to date, as well as for the cost for providing a connection to the sewer, excavation, backfilling, pavement replacement and installation of the sewer line from the sewer to the property line. In the event that boring under any street is required for installation, the cost of said boring shall be paid by the owner. The owner shall indemnify the town from any loss or damage that may directly or indirectly be occasioned by the connection to the sewage system.
(Ord. 2000-4, passed 10-2-2000) Penalty, see § 54.99