The size of the sewer to be built shall be determined by the Superintendent but in no case shall it be less than eight inches in diameter. All extensions to the public sewer shall be made with Vitrified Clap Pipe conforming to ASTM C-700 Extra Strength with ASTM C425 joints or ABS Pipe conforming to ASTM D-2680 with solvent or mechanical seal type joints. Manholes shall be constructed at each change in direction (horizontal and/or vertical) and not more than 400 feet apart on straight sewers. Construction methods shall be in accordance with the “Standard Specifications for Water and Sewer Main Construction in Illinois” adopted by the City Council and on file in the office of the Superintendent. All construction shall be subject to the inspection of the Superintendent or other designated representatives.
(Ord. 652, passed 8-21-95) Penalty, see § 51.999