§ 51.067 EXCAVATION REQUIREMENTS.
   (A)   All excavations required for the installation of a building sewer shall be open trench work, unless otherwise approved by the Superintendent, and no backfill shall be replaced until the sewer pipes laid therein have been inspected.
   (B)   All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city.
(Ord. 652, passed 8-21-95) Penalty, see § 51.999