1336.06  APPLICATION PROCEDURES FOR SWP3.
   (a)   The SWP3 and necessary data required by this regulation shall be submitted to the Community Engineer as follows:
      (1)   For subdivisions: After the approval of the preliminary plans and prior to the approval of improvement plans or drawings by the Community Planning Commission or as required by the Community.
      (2)   For other construction projects: concurrently with the submittal of construction drawings to the Community approval authority.
      (3)   For soil disturbing activities for which a permit is required; thirty (30) working days prior to any soil disturbing activities.
   (b)   The Community Engineer shall review the SWP3 for conformance with the provisions of this regulation and approve, or return for revisions with comments and recommendations for revisions, within twenty-one (21) working days after receipt of the SWP3 as described above.  A SWP3 rejected because of deficiencies shall receive a narrative report stating specific problems and the procedure for filing a revised SWP3.  At the time of receipt of a revised SWP3, another twenty-one (21) day review period shall begin.  The Community may consult with technical experts as necessary in reviewing the SWP3 required by this regulation.
   (c)   Approved SWP3’s shall remain valid for the duration of the related permit.   
(Ord. 08-13.  Passed 3-3-08.)