(a) Front Setback. Front setbacks shall be not less than that established in the above schedule unless shown otherwise on the Zoning Map. If a portion of the front yard is used for parking in accordance with the above schedule, a poured concrete curb or precast concrete barrier shall be erected or installed along the parking area line not less than the distance set forth above from the front property lines.
(b) Side and Rear Setback. Side and rear setbacks, where adjoining a Residential District, shall be provided as set forth in the above schedule and shall apply to all buildings, structures and parking and open yard uses.
(c) Side Setback on Corner Lot. Whenever a building is located on a corner lot, the width of the side setback on the side street shall be not less than fifty (50) feet. The parking setback from the side street shall be not less than thirty (30) feet.
(d) Location of Drives. No direct access shall be permitted onto Cleveland-Massillon Road or Ridgewood Road except for lots that have no other street access.
(e) Sidewalks. In any Office Park/Research District, pedestrian walking paths shall be reasonably provided between principal buildings, from principal building to accessory uses, and from principal buildings to the edge of the property, in order to create a continuous pedestrian system throughout the Office Park/Research District, and to other adjacent and nearby facilities that reasonably expect pedestrian access. Paths shall be hard surfaced and not less than five (5) feet in width.
(Ord. 2010-059. Passed 3-7-11.)