1337.23 INSPECTIONS.
(a) Notification; Time; Number of Inspections. Immediately upon completion of those portions of the installation which are thereafter to be concealed or covered, the heating contractor shall notify the Inspector of HVAC giving the location of the work, that such portions of the installation are ready for inspection; no person, firm or corporation shall lath over, plaster, or cover up any heating work before such work has been inspected and approved. The Inspector of HVAC shall have the right and authority to order the removal of all such lath, plaster, or other covering which may have been placed over such work before same has been inspected. The Inspector of HVAC must provide such requested inspection within two working days after notice, excepting Saturdays, Sundays and holidays. Upon completion of new installations and when otherwise applicable, a final inspection and approval by the HVAC Inspector is required. It shall be the responsibility of the registered HVAC contractor to notify the Inspector of HVAC when the installation is ready for final inspection.
(b) Stop Work Order. Wherever any work or project governed by the provisions of this chapter and for which a permit has been issued, as provided herein, is being performed or carried on in violation of any of the provisions of this Code, it shall be the duty of the Inspector of HVAC to post a printed notice to "stop work" signed by the Building Superintendent on the premises where such work is in progress; and to notify the permit holder of such "stop work" order and the reason therefor. After posting of such notice, no person, firm or corporation shall do any further work on such project which would interfere with further inspections under this chapter, until such time as the defects or violations of this Code have been corrected to the approval of the Inspector of HVAC and the "stop work" sign has been removed by him.
(Ord. 46-13. Passed 5-28-13.)