1337.09 PERMITS FOR INSTALLATION.
(a) Before the installation of any HVAC system is begun, a permit for installation shall be issued by the Building Superintendent. Such permit shall then be placed in the permanent records of the Division.
(c) Such application shall show the name of the owner of the building in which the system is to be installed, the location of the building, the estimated heat losses of the space to be heated, and the capacity of the equipment to be installed.
(d) A permit for installation of heating or cooling equipment shall be issued only if the heat or cooling loss or gain, properly calculated, does not exceed the actual capacity of the equipment proposed. A set of calculations, based on all the pertinent factors concerning the location in question, which show the proposed equipment is equal to or exceeds the calculated load demand, shall constitute prima facie evidence that the performance of the proposed system will meet all requirements of this Code.
(Ord. 46-13. Passed 5-28-13.)