1335.11   INSPECTIONS.
   (a)   Notification; Time; Number of Inspections. Immediately upon completion of those portions of the installation which are thereafter to be concealed or covered, the electrical contractor shall notify the Electrical Inspector or the Building Inspection Division, giving the location of the work, that such portions of the installation are ready for inspection; and no person, firm or corporation shall lath over, plaster, or cover up any electrical work before such work has been inspected and the electrical sticker initialed. The Electrical Inspector shall have the right and authority to order the removal of all such lath, plaster, or covering which may have been placed over such work before same has been inspected. The Electrical Inspector must make inspection within two working days after notice, excepting Saturdays, Sundays and holidays. Final inspection on new installations to be made upon completion of such work. Inspection of repair, replacement or conversion work is to be made upon completion of such work. All inspections must be requested in person or by telephone by the electrical contractor.
   (b)   Stop Work Order. Wherever any work or project governed by the provisions of this chapter and for which a permit has been issued, as provided herein, is being performed or carried on in violation of any of the provisions of this Code, it shall be the duty of the Electrical Inspector to post a "stop work" order signed by the Building Superintendent, on the premises where such work is in progress; and to notify the permit holder or his agent of such stop work order and the reason therefor. After the posting of such notice, no person, firm or corporation shall do any further work on such project which would interfere with further inspections under this chapter, until such time as the defects or violations of this Code have been eliminated to the approval of the Electrical Inspector, and the "stop work" order has been removed by him.
(Ord. 46-13. Passed 5-28-13.)