After the final inspection of the improvements by the City, the subdivider shall submit to the City "as-built" construction drawings showing improvements and all deviations from the construction plans.
"As-built" drawings shall consist of either ink on linen drawings or photographically reproduced mylars and shall show the following:
(a) Final curb elevations where street profile has been changed from the plan.
(b) Alignment changes.
(c) If no changes have been made, a statement to that fact shall be shown.
(d) Established bench marks.
(e) Invert and manhole rim elevations and distances between manholes for all storm and sanitary sewer lines. Manholes and sewer lines shall be shown in their proper, respective locations to other features.
(f) Water valves, back yard drains and similar features referenced to permanent visible features.
(g) Individual sanitary sewer and water service laterals.
The "as-built" drawings shall be a part of the performance bond or certified check. The performance bond or check shall be released only after "as-built" drawings have been received and approved by the City.
(Ord. 7-77. Passed 4-18-77.)
(Ord. 7-77. Passed 4-18-77.)