(a) Electric service and telephone service shall be provided within each subdivision. Gas service may be provided where reasonably accessible. Telephone, electric and street lighting wires, conduits, and cables shall be constructed underground except in cases where the City determines that subsurface conditions would result in excessive costs to the subdivider.
(b) Overhead utility lines, where permitted, shall be located at the rear of all lots. The width of the easement per lot shall be not less than five feet and the total easement width shall be not less than ten feet.
(c) Whenever two or more utilities (sanitary sewer line, water line, gas line, electric and/or telephone line) are each placed underground in the same utility easement, a width greater than the minimum ten feet shall be required.
(Ord. 7-77. Passed 4-18-77.)
(Ord. 7-77. Passed 4-18-77.)