1116.05 SURVEY MONUMENTS.
   (a)    A complete survey shall be made by a registered surveyor.
   (b)    The traverse of the exterior boundaries of the tract and of each block, when computed from field measurements of the ground, shall close within a limit of error of one foot to 10,000 feet of the perimeter before balancing the survey.
   (c)    Permanent concrete monuments, at least thirty-six inches long and at least six inches in diameter, shall be accurately set and established at the intersections of all outside boundary lines of the subdivision.
   (d)    Solid iron pin monuments, three-quarter inch in diameter and thirty inches long, shall be placed by the surveyor at all points on boundary lines where there is a change of direction and at all lot corners.
   (e)   There shall be no final release of performance bond until after monuments have been placed.
(Ord. 7-77. Passed 4-18-77.)