The following information shall be supplied in addition to the requirements in Section 1113.08:
(a) A completed application on forms provided by the City;
(b) Statement of proposed use of lots, giving type and number of dwelling units and type of business or industry;
(c) Location and approximate dimensions of all existing buildings;
(d) For commercial and industrial development, the location, dimensions and approximate grade of proposed parking and loading areas, alleys, pedestrian walks, streets and the points of vehicular ingress and egress to the development;
(e) Description of proposed covenants and restrictions;
(f) The subdivider shall state how sewage disposal and water supply will be provided. The City Engineer may require an analysis be provided demonstrating adequate utility capacity;
(g) Traffic impact analysis as required by the City Engineer for subdivisions creating twenty-five or more lots and/or dwellings, an analysis would involve at the minimum:
(1) Development's projected traffic generation (peak hour over twenty-four hours estimate);
(2) Traffic assignment to development entrances and adjoining street;
(h) Storm drainage calculations as required by the City Engineer; and
(i) Soil erosion and sedimentation control strategy.
(Ord. 15-89. Passed 4-3-89.)
(Ord. 15-89. Passed 4-3-89.)