§ 50.121 COMPLIANCE MONITORING.
   (A)   Inspection and sampling. The City Manager shall have the right to enter the facilities of any industrial user to ascertain whether the purpose of this chapter, and any permit or order issued hereunder, is being met and whether the industrial user is complying with all requirements thereof. Industrial users shall allow the City Manager or his representatives ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties.
      (1)   Where an industrial user has security measures in force which require proper identification and clearance before entry into its premises, the industrial user shall make necessary arrangement with its security guards so that, upon presentation of suitable identification, personnel for the city, state, and EPA shall be permitted to enter without delay, for the purposes of performing their specific responsibilities.
      (2)   The city, state, and EPA shall have the right to set up on the industrial user's property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the user's operations.
      (3)   The city may require the industrial user to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the industrial user at its own expense. The monitoring equipment should normally be situated on the user's premises, but the city may, when such a location would be impractical or cause undue hardship on the user, allow the facility to be constructed in the public street or sidewalk area and located so that the facility will not be obstructed by landscaping or parked vehicles. All devices used to measure wastewater flow and quality shall be calibrated yearly to ensure their accuracy.
      (4)   Any temporary or permanent obstruction to safe and easy access to the industrial facility to be inspected and/or sampled shall be promptly removed by the industrial user at the written or verbal request of the City Manager and shall not be replaced. The costs of clearing such access shall be born by the industrial user.
      (5)   Unreasonable delays in allowing city personnel access to the industrial user's premises shall be a violation of this chapter.
      (6)   Whether constructed on public or private property, the sampling and monitoring facilities shall be provided in accordance with the city's requirements and all applicable local agency construction standards and specifications. Construction shall be completed within 90 days following written notification by the city, unless a time extension is otherwise granted by the city.
('63 Code, § 5-5.701)
   (B)   Search warrants. If the City Manager has been refused access to a building, structure, or property or any part thereof, and if the City Manager has demonstrated probable cause to believe that there may be a violation of this chapter or that there is a need to inspect as part of a routine inspection program of the city designed to verify compliance with this chapter or any permit or order issued hereunder, or to protect the overall public health, safety, and welfare of the community, then the City Attorney may apply to the appropriate court for a search and/or seizure warrant describing therein the specific location subject to the warrant. The warrant shall specify what, if anything, may be searched and/or seized on the property described. In the event of an emergency affecting public health and safety, inspections shall be made without the issuance of a warrant.
('63 Code, § 5-5.702)
(Ord. 571-C.S., passed 6-2-94; Am. Ord. 775-C.S., passed 12-20-11)