Loading...
9-9-9: STORAGE BUILDINGS:
Buildings that are to be used for storage purposes only may exceed the maximum number of stories that are permitted in the district in which they are located, but such buildings shall not exceed the number of feet of the building height permitted in such districts. (Ord. 215, 9-17-1962)
9-9-10: TEMPORARY BUILDINGS:
Temporary buildings that are used in conjunction with construction work only may be permitted in any district during the period that the building is being constructed but such temporary buildings shall be removed upon completion of the construction work. (Ord. 215, 9-17-1962)
9-9-11: INDUSTRIAL BUILDINGS:
More than one industrial, commercial, multiple dwelling, or institutional building may be erected upon a single lot or tract provided they are developed as a unit, but the yards and open spaces required around the boundaries of the lot or tract shall not be encroached upon by any such buildings, nor shall there be any change in the intensity of use regulations. (Ord. 215, 9-17-1962)
9-9-12: CONTIGUOUS LOTS:
Two (2) or more contiguous nonconforming lots of record may be resubdivided into the same or lesser number of lots provided that none of such lots after such resubdivision will have an area less than that which any of said lots so resubdivided had prior to such resubdivision. (Ord. 215, 9-17-1962)