(a) Taps and service connections shall be installed to serve only those premises which are located on dedicated streets or thoroughfares or which abut a plot for which a deed of easement has been duly executed and accepted by the City, in which has been installed a water main line of not less than four inches inside diameter.
(b) Service connections may be obtained by applying at the Office of Elyria Public Utilities. For all applications for three or more units, a plot plan must be submitted to the City Engineer before application. Such application shall contain the name of the owner of the premises, or his agent, the use to which water is to be applied, the correct name of the street, street number, lot number and plot plan of the premises to be supplied with water.
(c) Taps and service connections shall be installed only by duly authorized agents of the City or approved contractor with guidance from the Water Distribution Department. Installation will be made only after customer's branch has been properly inspected and the Water Distribution Department has been notified as herein required.
(d) Developers of multiple dwelling tracts or subdivisions may opt to install taps themselves with permission and guidance of the City Engineers and Water Distribution Departments.
(Ord. 2017-10. Passed 2-6-17.)